- All Products
- Hubei Wan'an Environmental Protection HB-II Automatic Oil Cut off and Drainage Device
1. Working principle
The cold regions in the north have large seasonal temperature differences and deep permafrost layers. To prevent the sedimentation well and drainage pipe from freezing in winter and ensure the effectiveness of the automatic oil interception and drainage system in the tank area, the drainage pipe of the automatic oil interception and drainage system is buried parallel below the frozen soil layer during installation. This ensures that the automatic oil interception and drainage system is not affected by seasonal temperature differences and can automatically discharge water, intercept oil, and shut down when there is no water.
2. Structural dimension table

3. Installation
This product is directly installed in the sand settling well of the oil tank area and connected directly to the rainwater drainage pipe. For detailed dimensions, please refer to the "General Transportation Applicable Atlas" SH104-2006 "Oil Tank Area Water Seal Valve Installation Drawing" of Sinopec Industrial General Drawing.
1. Open the packaging and list the equipment according to the packing list;
2. Connect the float to the outlet end;
3. After installing the valve core and lever, connect the support rod between the float and the lever;
4. After installing the counterweight, it will be put into use immediately;
5. Please install according to the following view:
Specifications
| Companies | Hubei Wan'an Environmental Protection and Petrochemical Equipment Co., Ltd. |

